ClearMax Labs runs dentalnetworkhelp.com and builds the IT inside new and refreshed dental offices in Charlotte. ClearMax technicians work on site for the cabling, access points, door readers, cameras, displays, server and computers, all under one written project with a start, a scope and a handover. A monthly plan is never a condition of the work.
Last updated: November 2026
The parts of a practice ClearMax Labs builds
- Inside the walls: network cabling from the operatories, imaging, front desk and ceilings to one labeled panel.
- In the ceiling: commercial WiFi, with the guest network kept off the clinical one.
- At the doors: card or fob readers on the doors that need a record, each still free to open from inside.
- On the walls: cameras on entrances, hallways and sterilization, recording without sound.
- Displays: planned with the rest of the project.
- In the closet and at the desks: the server, its backup, and a computer set up for each role.
How the trades split on a Charlotte buildout
Dental projects carry more trades than most tenant fit-outs, and gaps appear where each assumes another one has it covered. The plan names them on page one.
- General contractor: framing, drywall, ceilings, power to the building, and the calendar everyone else works to.
- Equipment dealer: the chairs, sensors and imaging units, plus the layout drawings that say where they go.
- Internet provider: the circuit into the building. The practice places that order, as early as it can.
- Software vendor: the dental program and its help desk. ClearMax Labs is not affiliated with any dental software company.
- ClearMax technicians: data cabling, controlled doors, cameras, WiFi, the server and the computers, on site.
- The practice: the decisions and the sign-off, with each account and license registered to the practice itself.
Permits follow the same split. Mecklenburg County Code Enforcement says that where different contractors install low voltage wiring, each contractor will need to submit separate permit applications. The schedule lists whose filing is whose, so an inspection is not held up waiting on a trade nobody called.
From the first message to the handover
- The practice describes the project on the contact page.
- ClearMax Labs asks for what is missing: floor plan, equipment list, door list, contractor dates.
- A written scope and quote come back, built from those details. Work starts only after the practice agrees, and anything found later is raised and the bid updated.
- Cabling and door wiring go in at rough-in; devices, server and computers at finish.
- Each run, door, camera and access point is tested, and the practice receives the records.
The handover file a Charlotte practice receives
A handover file: cable labels and the drop map, door and camera lists, network names, the server build and where the backups go. Whoever opens the closet next, ClearMax or anyone else, starts from a known state.
Old equipment is part of that record. North Carolina's G.S. 75-64 names policies requiring the destruction or erasure of electronic media and other nonpaper media containing personal information among its reasonable measures. Drives from replaced computers are erased or destroyed and the date is logged, instead of sitting in a box under the stairs. None of this is legal advice; questions about what a rule asks of a given practice belong with its own counsel.